VA Medical IDIQ Multi-Campus Contract
Leavenworth, KS;
Topeka, KS;
 
Topeka VA Medical Center
Topeka, KS

Improve Security Lighting:


-Schematic design and analysis of additional layout for historic site lighting option, including detailed point-to-point site lighting calculations

-Construction cost estimate of additional layout for all historic site lighting option

-Electrical power, lighting, and control systems design for all historic site lighting option

-Construction administration services required for all historic site lighting option. Bathroom Renovation

-Convert existing women’s handicap restroom to women’s/family restroom

-Provide each temporary workstation with quadruplex receptacle from emergency source, and combination telephone/data connection

-Provide temporary security system devices as directed by the COTR

-Maintain fire alarm system protection during all occupies hours per NFPA 72.

-Maintain space illumination, HVAC, and egress lighting in service

AWE Corrections:
 
-Replace drench hose currently being used as an eyewash station with a new deck mounted eyewash station and connect to existing mixing valve

-Replace float type overflow valves in the feed-water de-aerator overflow system with an independent control system with a conductivity probe water level sensor and butterfly type overflow valves

-Modify the existing boiler plant building combustible and carbon monoxide monitoring system to meet VA Master Specification section 230911. 




Leavenworth VA Medical Center
Leavenworth, KS

Improve Security Lighting:


-Schematic design and analysis of additional layout for historic site lighting option, including detailed point-to-point site lighting calculations

-Construction cost estimate of additional layout for all historic site lighting option

-Electrical power, lighting, and control systems design for all historic site lighting option

-Construction administration services required for all historic site lighting option. Ø  B71 OA/EA Retrofit

-Design Dedicated Outdoor Air Units (DOAS) to provide outside air and exhaust for the building and related ductwork piping and related accessory systems

-Provide Fire/Smoke combination dampers and duct detectors in new units o   Extend FA system and programming

-Provide new hot water pumps

-Design control systems, electrical improvements, and plumbing systems improvements

-Replace Emergency Generators o   Design emergency generator system complete with weather proof enclosure and ATS, etc.

-Provide upgrades of normal power service and related wiring in order to accommodate three new electric chillers

-Design emergency generator system complete with day tank and ATS, etc. o   Provide upgrades for remote system monitoring and controls

-Systems design to incorporate multiple construction bid deduct alternates

AWE Corrections:

-Replace drench hose currently being used as an eyewash station with a new deck mounted eyewash station and connect to existing mixing valve

-Replace float type overflow valves in the feed-water de-aerator overflow system with an independent control system with a conductivity probe water level sensor and butterfly type overflow valves

-Modify the existing boiler plant building combustible and carbon monoxide monitoring system to meet VA Master Specification section 230911.



Bartholomew County
Columbus, IN


-Energy modeling for a facility to be divided into four departments of service (General Office, Customer Service, Engineering and Operations).

-Spaces are designed to promote good circulation so that each department can be easily interfaced with other departments.

-The facility is being considered for LEED Silver Certification. Some sustainable features include: variable refrigerant flow (VRF) HVAC system, on-site renewables (solar and wind), LED lighting, daylighting control, etc.





City Hall Building
Kansas City, MO


-S & S Engineering provided Master planning of mechanical, electrical and plumbing systems for 31-story building.

-We investigated existing equipment and systems for problems through condition survey and developed phased replacement plan with more energy efficient equipment and systems

-Prepared report of findings and made recommendations
 
-Performed utility bill analysis; and Presented findings to a City Architect, Facilities Management, and Board members





Doniphan County
Troy, KS


-S & S Engineering was hired to provide an IGA report containing technical analysis of Energy Conservation Measures (ECMs) applicable to 20,400 SF, Doniphan County Courthouse

-4,000 SF Health Department; 11,000 SF Law Enforcement Building, and 1,299 SF Extension Center Building
 
-The analysis included the cost to implement the ECMs, the energy cost and water & sewer savings associated with the ECMs, simple payback, and percentage of current energy consumption saved by implementation of the ECMs

-The ECMs pursued for this project were lighting retrofit, water conservation, storm windows, roof replacement, HVAC upgrades, controls upgrades, etc.

-Development of concept design and alternative feasible systems

-Development of schematic design drawings for contractor’s pricing

-Development of a system model for calibrated simulation and savings calculations for ECMs

-Preparation of a report of simple payback for the ECMs with cost input from contractors




Atchison County Courthouse
Atchison, Kansas
   

-Provided energy management consulting services to develop functional standards and a baseline for existing systems at the Atchison County Courthouse in Atchison, Kansas. 

Our services included:

-Development of concept design and alternative feasible systems

-Development of detailed design for contractor’s pricing

-Development of a system model for simulation and savings calculations for ECMs

-Preparation of a report of simple payback for the ECMs with cost input from contractors
   
-Current energy consumption: 68,391 Btu/sf/yr.

-Projected consumption after ECMs implemented: 49,956 Btu/sf/yr.





Kansas City Corps of Engineers
Ft. Leonard Wood, MO

-Energy Analysis for Counter Explosive Hazard Complex that included an Administrative Building and a 15-dog kennel

-Energy Analysis for a 30-dog kennel

-Evaluation and design of HVAC system improvements for 62,000 square foot 3-story building chiller plant

-Project included demolition, installation of two new 140-ton rotary screw, air-cooled chillers, new chilled water pumping system, new piping system



Kansas Gas Service
Topeka, KS


-Investigation and recommendations followed by design for the HVAC system for a computer room/data room

-Evaluation of the existing cooling system and associated electrical emergency power system for two-computer/server rooms (Telephone Room 151 & LAN & UPS room) and make recommendation in a report to improve the reliability/redundancy with the current systems for a data center like setup

-Proposed new computer room air-conditioning (CRAC) system to improve the reliability/redundancy of the current systems




Two Brush Creek Office Building
Kansas City, MO

-Evaluation and design of HVAC system improvements for 66,000 square foot 5-story building

-Three different chiller types were compared (centrifugal, screw, and Turbo core) for efficiency in an office building

-Energy analysis was performed taking into consideration load profile, run hours, etc.  A life-cycle cost analysis was performed

-Design included demolition, new chiller with magnetic bearing compressor, cooling tower with VFD, chilled water and condenser water pumping systems, mechanical room ventilation, chiller room refrigerant monitoring system, etc.





Embassy Suites
Kansas City, MO

-New guestroom bathroom exhaust

-New building makeup air systems

-New electrical power revisions and controls







Wellington Place Twin Towers (East and West)
Kansas City, MO

-
Approximately 250,000 square feet of new mixed-use property

-Penthouses on the top three floors

-Lower floors will contain offices

-5,000 to 7,000 square feet of retail space on the ground floor, a cinema and a bank






Corbin Crossing Apartments
Overland Park, KS

-Design for new one, two, and three bedroom apartment homes feature

-21 Buildings, 9 Building Types, 8 Unit Types

-Underground garages

-24-Hour State-of-the-Art Fitness Center

-Business Center Onsite

-Exquisite Clubhouse Including Great Room

-Additional Storage





The Dunes at Eastland Center
Independence, MO

-
Design for 240 units, 16 buildings include

-4 Building Types

-7 Unit Types

-Carports / Garages

-Clubhouse / pool

-Maintenance Building

-237,800 total square feet

-Infrastructure includes rain garden drainage system




Briarcliff Hilltop Apartments
Kansas City, MO

-Preparation of detailed drawings and specifications for HVAC, plumbing, and electrical systems for project bidding, permitting and construction

-Coordination with your Office, serving utilities, other consultants, and contractors, as required

-Assistance in obtaining contractor bids as required, and in obtaining required building permits

-Construction phase services including processing Contractors’ shop drawings, field coordination, attendance at required meetings, and site observation visits with observation reports (if required) will be provided on an hourly fee basis with a guaranteed maximum as tabulated below




Prairie Heights Apartments
Kansas City, KS

MEP design 332 new apartment units


Mt. Washington
Kansas City, MO

Conversion of historic Mt. Washington Elementary school to a senior apartments and community auditorium